Combination Method Configuration
The Combination payment method is for residents who pay part of their accommodation as a lump sum and the rest as a daily payment. The lump sum sits in their Lump Sum Account; the daily part is charged through a Daily Accommodation Payment (DAP) fee item. Because the two are linked, any change to the lump sum balance must change the daily DAP the resident owes. Maica keeps the two in step through the DAP portion and its recalculation logic.
This article explains how the Combination method is wired, how the DAP portion is calculated, when it is recalculated, and how the two trigger paths differ. It is written for administrators and power users.
What the Combination method represents
Every resident with a lump sum account has a Payment Method, one of Full Lump Sum, Combination, DAP Only, or Undecided. Under Combination, the resident has paid part of the agreed room price as a lump sum and pays a daily DAP on the uncovered remainder. As the lump sum balance moves, the uncovered remainder moves with it, and so does the daily DAP.
Full Lump Sum
Covers the full room price
None
No
Combination
Covers part of the room price
Charged on the remainder
Yes
DAP Only
None
Charged on the full room price
No (no account exists)
Undecided
Not yet decided
Not yet decided
No
The account-to-fee-item link
The connection between the deposit and the daily charge is the DAP Agreement Item lookup (maica_cc__DAP_Agreement_Item__c) on the Lump Sum Account. It points directly at the resident's DAP fee item (the Agreement Item) so the system can update the daily rate whenever the balance changes.
This lookup is populated only for Combination residents. It is set automatically when the lump sum account is created, from the active DAP fee item that must already exist on the Service Agreement's Fees tab. The presence of this link is what tells the recalculation logic that a DAP portion needs maintaining; where it is blank, there is no DAP to recalculate and the logic does nothing.
The DAP portion calculation
The daily DAP for a Combination resident is held in the DAP Portion field (maica_cc__DAP_Portion__c) on the account. It is the daily interest cost on the part of the room price the lump sum does not cover:
The result is rounded to the cent and clamped at zero. When the balance covers the full room price (or more), the uncovered remainder is zero or negative, so the DAP portion is zero; there is nothing to charge daily.
Retention add-back. For the Post 1 November 2025 fee arrangement, the cumulative retention already deducted counts as still paid, so it is added back before the uncovered amount is worked out. For every other fee arrangement the add-back is zero.
Indexation. Where the linked DAP item has already been indexed, the recalculated rate keeps the indexation factor already applied to it, so an indexed DAP is not reset to its un-indexed rate.
When the DAP portion is recalculated
The DAP portion is recalculated every time the lump sum balance changes. There are two distinct trigger paths, and the difference between them matters.
User-led changes on the RAD/RAC tab
When a user records a balance-changing operation through the RAD/RAC tab, the system recalculates the DAP portion as part of that operation and updates the DAP Portion field on the account. The operations that trigger this are:
Recording an initial payment
Recording an additional payment
Recording a draw-down
Processing a partial refund
Changing the payment method to Combination
For these user-led operations, the system updates the account's DAP Portion but does not automatically change the rate on the DAP Agreement Item. Instead it shows an advisory prompting the user to update the DAP fee item rate on the Fees tab to match the new amount. This keeps the user in control of the fee item that drives billing.
This recalculation applies only when the resident's Deposit Type is a Refundable Accommodation Deposit (RAD). For a Combination resident whose deposit is a Refundable Accommodation Contribution (RAC) or a legacy Accommodation Bond, the manual recalculation is deliberately suppressed and no advisory is shown, because their daily contribution rates are means-tested and set by Services Australia fee advice rather than derived from the MPIR formula.
Automatic draw-downs by the billing engine
When the billing engine performs an automatic RAD draw-down on a Combination RAD account, it recalculates the DAP portion itself as a follow-up step, and unlike the user-led path it applies the result to billing. It does this by stepping the DAP fee item rather than editing its rate in place:
The original DAP Agreement Item keeps its rate and ends on the last day of the period the draw-down settles, because that day was already billed at the old rate.
A successor DAP Agreement Item starts the day after, carrying the recalculated rate and the original item's end date. The Lump Sum Account links to the successor.
The DAP Portion on the Lump Sum Account and the DAP Rate After Transaction on the draw-down transaction that triggered it carry the successor's rate, giving a full audit history of rate changes over time.
Because the successor starts after the last billed day, no billed period is re-rated and no retrospective adjustment line is raised.
This step is non-blocking. It runs in its own protected block so that if it fails, the draw-down that already succeeded is not rolled back. On failure the engine writes an error log (with the account and the originating invoice context) rather than raising an error to the resident's billing.
Accounts where nothing is recalculated
The automatic recalculation does nothing, and writes no log, for a Full Lump Sum account that still has a DAP linked, for a Combination account paying a RAC or legacy Accommodation Bond, and for an account with no linked DAP.
Where the interest rate comes from
Both trigger paths use the MPIR at Agreement (maica_cc__MPIR_at_Agreement__c) on the Service Agreement: the rate captured for the resident when they signed their agreement. The automatic draw-down path does not use the organisation-wide RAC Current MPIR setting, so the two paths produce the same DAP portion for the same resident and balance.
When the recalculation is skipped
The automatic recalculation does not fail the draw-down when it cannot run. It skips the recalculation, changes nothing, and writes one log naming the reason, so the gap is visible to administrators:
The Service Agreement has no MPIR at Agreement
The Lump Sum Account has no Agreed Room Price. The recalculation never steps the DAP to $0.00 on a missing price
There is no draw-down transaction to date the new rate from
Last updated
Was this helpful?